Haakon Manufacturing Facility

Client: Haakon Industries

Location: Asheville, NC

Electrical Contract Value: $2.3 Million

Project Size: 100,000 sq. ft.

Project Duration: 12 Months

The Haakon Facility is designed to meet the growing demand for high-quality, customizable HVAC products used in commercial, industrial, and institutional applications. This facility includes multiple modern buildings that utilize the latest in HVAC manufacturing technology to ensure the highest standards of quality control.

Electrical systems at the Haakon Facility are engineered to support a range of sophisticated manufacturing technologies including highly automated machinery, 3D modeling equipment, and computer-controlled systems, facilitating both the production and quality control processes. The robust power distribution systems ensure that the facility’s production capabilities are maintained.